Schedule Page
1. Click on “Add / Remove Open Shifts”
2. Select date-range (to be removed)
3. Select the desired calendar. *each calendar has to be done separately
4. Leave “REMOVE” selected
5. Click on “SAVE CHANGES”
Schedule Page
1. Click on “Add / Remove Open Shifts”
2. Select date-range (to be removed)
3. Select the desired calendar. *each calendar has to be done separately
4. Leave “REMOVE” selected
5. Click on “SAVE CHANGES”
Comments
0 comments
Please sign in to leave a comment.